RDJE, Inc.
Thomaston Mills Reservoir Precast Elevated Intake Structure
Project Location:
Project Total: $1,619,964
Work included poured in place concrete foundation and concrete bends with a average height of 40 vertical feet, 50’ long double tee precast sections for pier, vertical turbine pumps, masonry electrical control building and installation of 1,450 lf of 20” – 24” ductile iron piping.
Go To Top