Project Total: $1,306,489
Drainage improvements were performed on 12 separate locations. The work included grading, erosion control, installation of RCP from 15” to 60”, HDPE 24” to 54”, culverts, catch basins, headwalls, manholes, concrete & asphalt removal and replacement, by-pass pumping, removal of unsuitable soils, stone bedding, raised lid inlets, and junction boxes.